Toyota Building 800

Project Details

  • Georgetown, Kentucky
  • Scope: Flammable vapor exhaust system design (NFPA code compliance)
  • Partnered with MVH Industrial
  • Toyota Motor Manufacturing, Kentucky, Inc. (TMMK) is Toyota’s largest vehicle manufacturing plant in the world, with annual capacity to produce 550,000 vehicles and 600,000 engines. Since 1988, over 11 million vehicles have rolled off Toyota’s assembly lines in Georgetown, where full-time employment is more than 8,000.  In addition to the Camry, America’s best-selling car, TMMK manufactures the Camry Hybrid, Avalon, and Avalon Hybrid as well as four-cylinder and V-6 engines. In 2015, the plant also started producing the Lexus ES 350, marking the first time a Lexus vehicle has been made in the U.S.  More than 1.5 million training hours and an investment of $360 million went into bringing Lexus’ best-selling sedan on-line at TMMK.  More info can be found at toyotaky.com/boutdex.asp

Latest Blogs & News

Illustrative community facility with rooftop solar panels and landscaped grounds

How long does direct pay take? Why your tax year matters

Direct Pay, Elective Pay, ITC, Tax Incentives | November 11, 2026

What the 2027 Inflation Adjustments Mean for Walker Blue Clients

179D, Blog, IRS Section 179 Deduction | November 6, 2026

What the 2026 Midterms Mean for §179D and the ITC

179D, 179D Updates, Blog, ITC | November 5, 2026

Illustration of a school building with underground geothermal loops connected to heat pump equipment, accompanying a guide to qualifying project costs.

What Costs Qualify for the Commercial Geothermal Heat Pump Tax Credit?

Blog, Direct Pay, Geothermal Tax Credit, ITC, Uncategorized | October 21, 2026

Walker Blue engineer reviewing payroll records against a Department of Labor wage determination (edit to describe the actual photo)

PWA compliance for clean energy tax credits: exceptions, penalties and the weekly record

179D, Blog, ITC, prevailing wage and apprenticeship (PWA) | October 7, 2026

ESCO professionals reviewing plans for an energy project while addressing ITC questions

Eight ITC questions ESCOs keep asking- answered

Blog, Geothermal Tax Credit, ITC, Uncategorized | September 29, 2026

2026 tax credit for a geothermal energy project showing drilling equipment and ground-loop installation at a commercial building.

The geothermal tax credit in 2026 and who can still claim it

Blog, Direct Pay, Geothermal Tax Credit, Uncategorized | August 28, 2026

Contact Walker Blue Today